logo

Belize Co-generation Energy Limited

Sector: Consumer Products • Location: Belize

Source: World Bank Group

Project
Active

Belize Co-generation Energy Limited (Belcogen) was developing a 31.5 MW, partially captive, bagasse-fired cogeneration plant. Belcogen had a 15-year power purchase agreement with Belize Electricity Limited (BEL). Under the PPA, due to commence in mid-2009, Belcogen was to make 14 MW of capacity available to the offtaker. The remainder of the capacity was to be made available to the sugar refinery

Project Information FAQ

Project Information

5 Q
The project “Belize Co-generation Energy Limited” is an infrastructure initiative in the Consumer Products sector, located in Belize. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Belize Co-generation Energy Limited (Belcogen) was developing a 31.5 MW, partially captive, bagasse-fired cogeneration plant. Belcogen had a 15-year power purchase agreement with Belize Electricity Limited (BEL). Under the PPA, due to commence in mid-2009, Belcogen was to make 14 MW of capacity available to the offtaker. The remainder of the capacity was to be made available to the sugar refinery owned by the project sponsor, Belize Sugar Industries (BSI). The greenfield project was to be developed on a build, own and operate basis. The plant was located within BSI’s Tower Hill compound, near Orange Walk town in northern Belize. The project was intended to expand the national electricity supply in Belize, and was expected to amount to 20% of total generation capacity in the country. The US$62 million project reached financial closure on March 15, 2007, with the conclusion of a US$35.25 million loan agreement between Belize Sugar Industries and a consortium of multilaterals and development banks. The consortium included Inter American Development Bank (US$8.8 million), Caribbean Development Bank (US$8.8 million), Netherlands Development Finance Company [FMO] (US$8.8 million) and Corporacion Interamericana para el Financiamiento de Infraestructura (CIFI). Belize Sugar Industries was expected to contribute US$26.75 million in equity financing. In March 2007, Belcogen announced that it had awarded an engineering, procurement and construction (EPC) contract to Chinese engineering firm, SFECO. Construction commenced during 2008 and the plant was expected to be fully commercially operational by the end of 2009. In December 2009 the plant became operational.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data