Belize Electricity Limited's Climate Mitigation Program
Sector: Road • Location: Belize
Source: Inter-American Development Bank (IADB)
The proposed transaction consists of a corporate loan tothe Borrowerfor up to US$30.0 million to (i) support its working capital requirements and finance its (i) working capital requirements and (ii) 2024/2026 capital expenditures program consisting, among others, of (a) the implementation of smart grid solutions and modernization of its information technology infrastructure, (b) financing of new
- Status
- Under Construction
- Sector
- Road, Power Generation (CCGT), Automotive, Electric Vehicles (EVs)
- Location
- Belize
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about Belize Electricity Limited's Climate Mitigation Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in implementation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed transaction consists of a corporate loan tothe Borrowerfor up to US$30.0 million to (i) support its working capital requirements and finance its (i) working capital requirements and (ii) 2024/2026 capital expenditures program consisting, among others, of (a) the implementation of smart grid solutions and modernization of its information technology infrastructure, (b) financing of new electric vehicles; (c) network enhancements; and (d) new and replacement of LED street lighting (the “Project”). The Financing will be structured in two phases: (a) phase 1 will consist of a committed tranche for up to US$15 million (“Phase 1” or the “Committed Facility”) comprised of (a) a revolving working capital tranche for up to US$5 million with a maturity period of 2 years and an availability period of 7 years and (b) a 7-year amortizing loan, including a 24-month grace period, for up to US$10 million; and (ii) phase 2 will consist of an uncommitted tranche for additional US$15 million (“Phase 2” or the ”Uncommitted Facility”) replicating the same terms and conditions as Phase 1. |
Original sector | Energy |
Budget |
Location
Country | Belize |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Automotive, Electric Vehicles (EVs) |
Article published date | 2025-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Belize
- Establishing a Joint Venture/Other/Processing and preserving of fruit and vegetables/Naledo Belize Ltd
- Flood Mitigation Infrastructure Program for Belize City
- Solid Waste Management Project
- Project Preparation Studies for the Rehabilitation of the Caracol Road
- Project preparation studies for George Price Highway Rehabilitat
- Ppf:studies of Southern Highway Project
- ROAD MAINTENANCE & R
- Municipal Development
