Bell Center-Columbia–Sugar Creek–IL/WI State Line 765-kV Transmission Line
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Stock Titan
AEP joint venture Midcontinent Grid Solutions will invest $1.2 billion to build a nearly 200-mile, 765-kV transmission line in Wisconsin to enhance reliability, strengthen the grid, and support growing demand inside the MISO footprint. The project uses Transource's "Guyed-Y" design to narrow right-of-way needs and targets a 2034 in-service date.
- Status
- Prospective
- Sector
- Electric Services
- Location
- Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Bell Center-Columbia–Sugar Creek–IL/WI State Line 765-kV Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AEP joint venture Midcontinent Grid Solutions will invest $1.2 billion to build a nearly 200-mile, 765-kV transmission line in Wisconsin to enhance reliability, strengthen the grid, and support growing demand inside the MISO footprint. The project uses Transource's "Guyed-Y" design to narrow right-of-way needs and targets a 2034 in-service date. |
Original sector | Electric Services |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Article published date | 2026-03-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
