Bell District Shared Use Path Construction (SUP)
Sector: Water Supply and Storage • Location: Cedar Park, Texas, United States of America
Source: Dodge
Construction of a 4000 foot shared use path along Brushy Creek Rd from Bell Blvd to US 183A. The project consists of a 10 concrete shared use path, a signalized CapMetro pedestrian crossing, to include but not limited to coordination with CapMetro and all required permits and insurance requirements, ADA ramps, drainage infrastructure, curb and gutter, minor grading, signing and pavement markings.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a 4000 foot shared use path along Brushy Creek Rd from Bell Blvd to US 183A. The project consists of a 10 concrete shared use path, a signalized CapMetro pedestrian crossing, to include but not limited to coordination with CapMetro and all required permits and insurance requirements, ADA ramps, drainage infrastructure, curb and gutter, minor grading, signing and pavement markings. This shared use path connects the regional trail system and pedestrian facilities along Bell Blvd... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
