Bell District Shared Use Path Construction (SUP)
Sector: Water Supply and Storage • Location: Cedar Park, Texas, United States of America
Source: Dodge
Construction of a 4000 foot shared use path along Brushy Creek Rd from Bell Blvd to US 183A. The project consists of a 10 concrete shared use path, a signalized CapMetro pedestrian crossing, to include but not limited to coordination with CapMetro and all required permits and insurance requirements, ADA ramps, drainage infrastructure, curb and gutter, minor grading, signing and pavement markings.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Mass Transit, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive, Rail
- Location
- Cedar Park, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bell District Shared Use Path Construction (SUP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 4000 foot shared use path along Brushy Creek Rd from Bell Blvd to US 183A. The project consists of a 10 concrete shared use path, a signalized CapMetro pedestrian crossing, to include but not limited to coordination with CapMetro and all required permits and insurance requirements, ADA ramps, drainage infrastructure, curb and gutter, minor grading, signing and pavement markings. This shared use path connects the regional trail system and pedestrian facilities along Bell Blvd... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Cedar Park |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Mass Transit, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive, Rail |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
