Bell Textron FLRAA Component Manufacturing Facility
Sector: Aerospace & Defense • Location: Fort Worth, Texas, United States
Source: Site Selection Magazine
Bell Textron is expanding its operations in Fort Worth, Texas, with a new $429 million facility dedicated to the Future Long Range Assault Aircraft (FLRAA) component manufacturing. This project is expected to create over 400 jobs and is set to begin Low-Rate Initial Production by 2028.
- Status
- Prospective
- Sector
- Aerospace & Defense, Commercial, Manufacturing (Industrial)
- Location
- Fort Worth, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Site Selection Magazine
ConstructChat
Ask ConstructChat about Bell Textron FLRAA Component Manufacturing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bell Textron is expanding its operations in Fort Worth, Texas, with a new $429 million facility dedicated to the Future Long Range Assault Aircraft (FLRAA) component manufacturing. This project is expected to create over 400 jobs and is set to begin Low-Rate Initial Production by 2028. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Worth |
Source
Source | Site Selection Magazine |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Commercial, Manufacturing (Industrial) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
