Bellam Boulevard Off-Ramp Improvement (TAM project)
Sector: Road • Location: California, United States of America
Source: Marin County Department of Public Works (DPW)
The Transportation Authority of Marin (TAM) project includes adding a second lane to the off-ramp of Bellam Boulevard from US 101, separating the traffic turning left onto Bellam Boulevard from the traffic turning right or continuing straight across the intersection to the eastbound I-580 on-ramp, widening the I-580 on-ramp in order to receive the shifted through lane. Additional improvements gene
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | road improvements and paving projects |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Transportation Authority of Marin (TAM) project includes adding a second lane to the off-ramp of Bellam Boulevard from US 101, separating the traffic turning left onto Bellam Boulevard from the traffic turning right or continuing straight across the intersection to the eastbound I-580 on-ramp, widening the I-580 on-ramp in order to receive the shifted through lane. Additional improvements generally include concrete barrier, traffic signal modification, storm drain improvements, pavement markings/striping and a new retaining wall. This project is intended to mitigate the traffic congestion on northbound US-101 and eastbound I-580 at the Bellam Boulevard off-ramp in San Rafael. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
