Bellary Davanagere Power Transmission Project
Sector: Power Generation (CCGT) • Location: Karnataka, India
Source: Outlook India
The project involves augmentation of transformation capacity at Davanagere PS and Bellary PS, and establishment of Bellary – Davanagere 2nd 400 kV Double Circuit line of around 72 km. It is an Inter State Transmission Project under Tariff-Based Competitive Bidding (TBCB) route, executed on Build, Own, Operate & Transfer (BOOT) basis.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Road
- Location
- Karnataka, India
- Updated
- 22 Jul 2026
- Source
- Outlook India
ConstructChat
Ask ConstructChat about Bellary Davanagere Power Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves augmentation of transformation capacity at Davanagere PS and Bellary PS, and establishment of Bellary – Davanagere 2nd 400 kV Double Circuit line of around 72 km. It is an Inter State Transmission Project under Tariff-Based Competitive Bidding (TBCB) route, executed on Build, Own, Operate & Transfer (BOOT) basis. |
Original sector | Power |
Location
Country | India |
State | Karnataka |
Source
Source | Outlook India |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road |
Article published date | 2026-02-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
