Belle Glade Water Main Improvements
Sector: Water Supply and Storage • Location: West Palm Beach, Florida, United States of America
Source: Dodge
the replacement, removal or abandonment of old and substandard potable water main pipes and water services with approximately 15,450 linear feet of new pipes, the relocation of approximately 35 existing water services from the back to the front of the properties, and incidental gravity main and fire hydrants replacements as well as associated appurtenances including site restoration of affected ar
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Belle Glade Water Main Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the replacement, removal or abandonment of old and substandard potable water main pipes and water services with approximately 15,450 linear feet of new pipes, the relocation of approximately 35 existing water services from the back to the front of the properties, and incidental gravity main and fire hydrants replacements as well as associated appurtenances including site restoration of affected areas. These improvements are necessary as part of the continued restoration and repair of water in... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
