logo

Bellingrath Rd AC Water Main Replacement Phase I

Sector: Water Supply and Storage • Location: Theodore, Alabama, United States of America

Source: Dodge USA

Project
Closed

Furnishing all labor and materials, and performing all work for constructing Bellingrath Road AC Water Main Replacement Phase 1 (Volkert Proj. No. 448938). The work consists primarily of the installation of approx. 6,500 LF of 10 PVC Water Main, 1,800 LF of 10 Ductile Iron Water Main, associated appurtenances and the abandonment of the existing Asbestos Cement Water Main.

Status
Closed
Sector
Water Supply and Storage, Government, Metal, Commercial, Road, Waste Processing and Treatment, Steel
Location
Theodore, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bellingrath Rd AC Water Main Replacement Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bellingrath Rd AC Water Main Replacement Phase I” is an infrastructure initiative in the Water Supply and Storage sector, located in Theodore, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Furnishing all labor and materials, and performing all work for constructing Bellingrath Road AC Water Main Replacement Phase 1 (Volkert Proj. No. 448938). The work consists primarily of the installation of approx. 6,500 LF of 10 PVC Water Main, 1,800 LF of 10 Ductile Iron Water Main, associated appurtenances and the abandonment of the existing Asbestos Cement Water Main.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Theodore

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Metal, Commercial, Road, Waste Processing and Treatment, Steel

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project