Bellis Fair Ph 2 Senior Housing
Sector: Manufacturing (Industrial) • Location: Bellingham, Washington, United States of America
Source: Dodge
Construction of a 4 story senior housing building with 64 apartment units, common amenities, and surface parking. There are no wage rate requirements for this project. The project is subject to ESDS requirements, see included document. The project requires apprentice reporting, see included documents.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Car parking, Automotive, Residential, Commercial
- Location
- Bellingham, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bellis Fair Ph 2 Senior Housing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 4 story senior housing building with 64 apartment units, common amenities, and surface parking. There are no wage rate requirements for this project. The project is subject to ESDS requirements, see included document. The project requires apprentice reporting, see included documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bellingham |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Car parking, Automotive, Residential, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
