Bellue Vue Subdivision Clean Water Project Phase 4
Sector: Waste Processing and Treatment • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
Extending the wastewater by a 150 meters and 235 meters of storm water to accommodate 8 new subdivision building lots, with new sewer lines, 6 manholes, 8 catch-basins, and storm drainage pipes as per approved engineering plans (from a Provincial Dept. of Transportation Engineer).
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Bellue Vue Subdivision Clean Water Project Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Extending the wastewater by a 150 meters and 235 meters of storm water to accommodate 8 new subdivision building lots, with new sewer lines, 6 manholes, 8 catch-basins, and storm drainage pipes as per approved engineering plans (from a Provincial Dept. of Transportation Engineer). |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
