Belo Monte transmission concession
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The project involves the development of a transmission system that will connect the Xingu (PA) Converting Station to the Rio Terminal Converting Station, transporting energy generated by the Belo Monte Hydroelectric Plant (UHE) located in the state of Pará, northern Brazil. The 2,535 km long direct current 800 kV transmission line use Ultra High Voltage (UAT) technology.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Belo Monte transmission concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a transmission system that will connect the Xingu (PA) Converting Station to the Rio Terminal Converting Station, transporting energy generated by the Belo Monte Hydroelectric Plant (UHE) located in the state of Pará, northern Brazil. The 2,535 km long direct current 800 kV transmission line use Ultra High Voltage (UAT) technology. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
