Belt Press Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project involves demolition of the existing belt press, procurement and installation of the new belt press with associated modifications of mechanical piping and electrical systems, and replacement of existing sludge transfer pump. Work includes control system modifications and integration.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Carpinteria, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Belt Press Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves demolition of the existing belt press, procurement and installation of the new belt press with associated modifications of mechanical piping and electrical systems, and replacement of existing sludge transfer pump. Work includes control system modifications and integration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Carpinteria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
