logo
ProjectPlanned

Beluga Solar Project

The owner, status and timeline of this project. A free account opens every field.

Source: Must Read Alaska

A 10-megawatt solar power project approved by Chugach Electric Association, aimed at expanding renewable energy capacity. The project is set for completion by October 2027 in Alaska.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
Anchorage, Alaska, United States of America
Updated
22 Jul 2026
Source
Must Read Alaska

ConstructChat

Ask ConstructChat about Beluga Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Beluga Solar Project” is an infrastructure initiative in the Solar sector, located in Anchorage, Alaska, United States. Taiyo aggregates data on it from Must Read Alaska.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 10-megawatt solar power project approved by Chugach Electric Association, aimed at expanding renewable energy capacity. The project is set for completion by October 2027 in Alaska.

Original sector

Energy

Location

Country

United States of America (USA)

State

Alaska

City

Anchorage

Source

Source

Must Read Alaska

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-12-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project