Bembla Irrigation Project
Sector: Cement • Location: Yavatmal, Maharashtra, India
Source: India Investment Grid (IIG)
Information Department of water resources-MH - II has come up with Bembla Irrigation Project with a ticket size of 2631.77 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Bembla Project is included under Centrally Sponsored Scheme, PMKSY-AIBP and pr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Department of water resources-MH - II has come up with Bembla Irrigation Project with a ticket size of 2631.77 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Bembla Project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion Its a Major irrigation Project situated in Yavatmal district of Maharashtra State across the river Bembla [a tributary of Wardha] in Godavari Basin. The main components of the project are as under- [i] 7203 m earthen dam with the maximum height of 19.06 m and 447 m masonry/ concrete dam having maximum height of 29.15 m with central spillway. [ii] Gated ogee shaped central spillway of 297 m long with 75 m long non-overflow section on either sides. The spillway has 20 radial gates each having size of 12 m x 8 m. Total Nos. of Beneficiries 23052 No. of SC Beneficiaries 2878 No. of ST Beneficiaries 1727 No. of Women Beneficiaries 691 During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 1033.99 crore Eligible Central Assistance was Rs 307.18 crore CA released since 2016 till Jan-2024- 285.23 crore State Share released through NABARD under LTIF till January 24- Rs 765.72 crore Physical progress- 95.30 percentage Financial Progress- 105.54 percentage Ultimate Irrigation Potential is 52423 Ha Irrigation Potential created till 31 Jan 2024- 50333 Ha Projected Date of Completion- 30 June -2024 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Cement projects in India
- Dholera Solar Park Gujarat
- Durgam Cheruvu Bridge
- Madras Atomic Project – Units 1 & 2 (2x220 Mwe)
- 330 MWp Solar PV Project in RUMS solar park, MP
- WIPRO SEZ, Bengaluru
- 1200 MW Punatsangchhu Hydel Electric Power Project
- Bandra Cable Stay Bridge – Bandra Worli Sea Link Project, Mumbai, India
- Jaypee Infratech Limited (Yamuna Expressway)
