logo
ProjectClosed

Bembla Irrigation Project

Sector: Cement • Location: Yavatmal, Maharashtra, India

Source: India Investment Grid (IIG)

Information Department of water resources-MH - II has come up with Bembla Irrigation Project with a ticket size of 2631.77 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Bembla Project is included under Centrally Sponsored Scheme, PMKSY-AIBP and pr

Status
Closed
Sector
Cement, Hydro, Water Supply and Storage, Road, Government
Location
Yavatmal, Maharashtra, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Bembla Irrigation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bembla Irrigation Project” is an infrastructure initiative in the Cement sector, located in Yavatmal, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Department of water resources-MH - II has come up with Bembla Irrigation Project with a ticket size of 2631.77 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Bembla Project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion Its a Major irrigation Project situated in Yavatmal district of Maharashtra State across the river Bembla [a tributary of Wardha] in Godavari Basin. The main components of the project are as under- [i] 7203 m earthen dam with the maximum height of 19.06 m and 447 m masonry/ concrete dam having maximum height of 29.15 m with central spillway. [ii] Gated ogee shaped central spillway of 297 m long with 75 m long non-overflow section on either sides. The spillway has 20 radial gates each having size of 12 m x 8 m. Total Nos. of Beneficiries 23052 No. of SC Beneficiaries 2878 No. of ST Beneficiaries 1727 No. of Women Beneficiaries 691 During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 1033.99 crore Eligible Central Assistance was Rs 307.18 crore CA released since 2016 till Jan-2024- 285.23 crore State Share released through NABARD under LTIF till January 24- Rs 765.72 crore Physical progress- 95.30 percentage Financial Progress- 105.54 percentage Ultimate Irrigation Potential is 52423 Ha Irrigation Potential created till 31 Jan 2024- 50333 Ha Projected Date of Completion- 30 June -2024

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Maharashtra

City

Yavatmal

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Cement, Hydro, Water Supply and Storage, Road, Government

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project