Bemidji (MN) Walmart Supercenter 3233-1004 CAPXREF-1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Note the intent of 11-115 summary is to assist vendors in identifying equipment needs. It is not intended for use by contractor to capture all scope issues. Refer to plans and specifications (where applicable) for additional information. Install secondary glycol refrigeration system on rack c and d replace md meat cases, systems c5, c6, and c7, 68' replace md deli cases, systems c9, c10, and c12,
- Status
- Closed
- Sector
- Consumer Products, Commercial, Manufacturing (Industrial)
- Location
- Bemidji, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bemidji (MN) Walmart Supercenter 3233-1004 CAPXREF-1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Note the intent of 11-115 summary is to assist vendors in identifying equipment needs. It is not intended for use by contractor to capture all scope issues. Refer to plans and specifications (where applicable) for additional information. Install secondary glycol refrigeration system on rack c and d replace md meat cases, systems c5, c6, and c7, 68' replace md deli cases, systems c9, c10, and c12, 84' replace md dairy cases, systems d8, d9, and d10, 112' replace rear load dairy cases, system d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Bemidji |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
