logo
ProjectUnder Construction

Bemidji Wastewater Plant Solar Array Project

The owner, status and timeline of this project. A free account opens every field.

Source: Daily Dispatch

This project involves adding a solar array to the wastewater plant in Bemidji, following a feasibility report in 2022. It aims to offset power usage by 30%, resulting in approximately $8,000 in yearly savings. The project cost is $155,124, funded 70% by a Minnesota Department of Commerce Solar on Public Buildings Program grant and 30% through a federal tax credit. Construction started in March 202

Status
Under Construction
Sector
Power Generation (CCGT), Water Supply and Storage, Government, Solar
Location
Bemidji, Minnesota, United States of America
Updated
22 Jul 2026
Source
Daily Dispatch

ConstructChat

Ask ConstructChat about Bemidji Wastewater Plant Solar Array Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bemidji Wastewater Plant Solar Array Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bemidji, Minnesota, United States. Taiyo aggregates data on it from Daily Dispatch.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves adding a solar array to the wastewater plant in Bemidji, following a feasibility report in 2022. It aims to offset power usage by 30%, resulting in approximately $8,000 in yearly savings. The project cost is $155,124, funded 70% by a Minnesota Department of Commerce Solar on Public Buildings Program grant and 30% through a federal tax credit. Construction started in March 2026.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Bemidji

Source

Source

Daily Dispatch

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Government, Solar

Article published date

2026-04-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project