logo

Benfica Kindergarten / DNSJ.arq

Sector: Road • Location: Lisbon

Source: ArchDaily

Project
Closed

Text description provided by the architects.The renovation of the Benfica Kindergarten, a building originally dating from 1995, sought to improve the building's performance by correcting pathologies, renewing the infrastructure networks, making it suitable for use by people with reduced mobility and improving safety conditions, particularly against fire.Volumetric reinforcement of the existing “ob

Project Information FAQ

Project Information

4 Q
The project “Benfica Kindergarten / DNSJ.arq” is an infrastructure initiative in the Road sector, located in Lisbon. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.The renovation of the Benfica Kindergarten, a building originally dating from 1995, sought to improve the building's performance by correcting pathologies, renewing the infrastructure networks, making it suitable for use by people with reduced mobility and improving safety conditions, particularly against fire.Volumetric reinforcement of the existing “object”In terms of urban image, the aim was to reinforce the relatively simple volumetry of the existing building by treating the volume in monochrome, which differentiates the equipment from the visually disorganized urban context.Functional reorganizationIn oder to take advantage of the existing spatial potential, the following was proposed:- The placement of the staircase in an exterior volume connected to the atrium, adding it to the building, which made it possible to intervene in a less intrusive way on the existing structure.- Functional differentiation by wing, placing the activity rooms and their respective toilet/storage areas at the ends of both wings, reserving the central part for the staff and kitchen/dining areas along with access to the upper floor.- The interiorization of the covered gallery to the south and east using a glazed system, which functions as a perimeter distribution circuit, under cover, allowing much more comfortable access to the spaces.A unitary treatment was proposed for the whole complex by choosing a single shade for walls, roofs and openings, which allows the boundaries between planes to be blurred and the whole building to be unified.- Use of the roof's basement in both wings for support rooms with toilets. Roof openings were opened up to provide this space with adequate ventilation and natural lighting. Direct exits to the outside were created, one in each wing.- The integration of an articulation zone between the street and the building, replacing the existing canopy. This area serves as a covered recreation area and outdoor waiting area, from which you can access a distributor atrium, articulating with the new interior corridors and the new staircase connecting floors and access to the cafeteria.- Partial covering of the play area, allowing natural light to pass through using a transparent covering surface made up of honeycomb polycarbonate sheets.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data