logo
Project

Benin - Project for the Electrification of seventeen Rural Centres

Sector: Power Generation (CCGT) • Location: Benin

Source: African Development Bank (AfDB)

The present intervention concerns the electrification project of 17 rural centers. It was initiated in 1995 with the completion of a feasibility study funded by the Canadian International Development Agency (CIDA). The project is part of the implementation of the rural electrification program provided for in the various development plans adopted by the Beninese government for several decades. It i

Sector
Power Generation (CCGT), Road, Government
Location
Benin
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Benin - Project for the Electrification of seventeen Rural Centres

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Benin - Project for the Electrification of seventeen Rural Centres” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Benin. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention concerns the electrification project of 17 rural centers. It was initiated in 1995 with the completion of a feasibility study funded by the Canadian International Development Agency (CIDA). The project is part of the implementation of the rural electrification program provided for in the various development plans adopted by the Beninese government for several decades. It involves the construction of a distribution network composed of MV lines (20kV), MV / LV transformer substations, LV networks, public lighting networks and subscriber power connections. Subsequently, the electrification of several localities located near the route of the new network should be supported by the project increasing their number from 17 to 28 localities. The project comprises the following components: (i) Extension of the medium voltage (MV) network of 20 kV; (ii) MV / LV transformer substation equipment; (iii) extension of the LV network and distribution; (iv) Installation of the connections and installation of public lighting hearths; (v) Acquisition of operating and subscriber management equipment; (vi) Studies, control and supervision of works; and (vii) External audit.

Original sector

Energy

Budget

Location

Country

Benin

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project