Benin - Project for the Electrification of seventeen Rural Centres
Sector: Power Generation (CCGT) • Location: Benin
Source: African Development Bank (AfDB)
The present intervention concerns the electrification project of 17 rural centers. It was initiated in 1995 with the completion of a feasibility study funded by the Canadian International Development Agency (CIDA). The project is part of the implementation of the rural electrification program provided for in the various development plans adopted by the Beninese government for several decades. It i
- Sector
- Power Generation (CCGT), Road, Government
- Location
- Benin
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Benin - Project for the Electrification of seventeen Rural Centres
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the electrification project of 17 rural centers. It was initiated in 1995 with the completion of a feasibility study funded by the Canadian International Development Agency (CIDA). The project is part of the implementation of the rural electrification program provided for in the various development plans adopted by the Beninese government for several decades. It involves the construction of a distribution network composed of MV lines (20kV), MV / LV transformer substations, LV networks, public lighting networks and subscriber power connections. Subsequently, the electrification of several localities located near the route of the new network should be supported by the project increasing their number from 17 to 28 localities. The project comprises the following components: (i) Extension of the medium voltage (MV) network of 20 kV; (ii) MV / LV transformer substation equipment; (iii) extension of the LV network and distribution; (iv) Installation of the connections and installation of public lighting hearths; (v) Acquisition of operating and subscriber management equipment; (vi) Studies, control and supervision of works; and (vii) External audit. |
Original sector | Energy |
Budget |
Location
Country | Benin |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Benin
- Benin drinking water supply systems lease
- Benin - Energy Sector Budget Support Programme - Phase I (PASEBE I)
- BENIN OFF-GRID SOLAR ACCELERATION
- BENIN - TOGO POWER REHABILITATION
- RESTRUCTURATION DES RESEAUX ELECTRIQUES - BENIN
- Weziza Benin solar mini-grids project
- 450 MW WAPP Maria Gleta Regional Power Generation Facility in Benin
- 240 MW Kaleta hydropower plant
