logo

Benin - Stormwater Management and Urban Resilience Project

Sector: Road • Location: Benin

Source: World Bank Group

Project
Active

The objective of the Stormwater Management and Urban Resilience Project for Benin is to reduce flood risks in selected areas of Cotonou and strengthen urban resilience management and capacity at the city level. There are three components to the project, the first component being storm water drainage investment and community engagement for flood risk reduction and climate change adaptation. The com

Project Information FAQ

Project Information

5 Q
The project “Benin - Stormwater Management and Urban Resilience Project” is an infrastructure initiative in the Road sector, located in Benin. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Stormwater Management and Urban Resilience Project for Benin is to reduce flood risks in selected areas of Cotonou and strengthen urban resilience management and capacity at the city level. There are three components to the project, the first component being storm water drainage investment and community engagement for flood risk reduction and climate change adaptation. The component will be implemented through two subcomponents: Construction of drainage infrastructure and related works in Cotonou’s Basin Y, Basin Pa3 and Basin AAc, and Strengthening community awareness, capacity and engagement in flood risk and climate change adaptation. The second component is the strengthening urban resilience management and capacity. The component will be implemented through three subcomponents: operation and maintenance mechanism for the drainage network, data sharing platform and hydrological flood model, and capacity building plan. Finally, the third component is the project management, monitoring and evaluation. The overall objective of the component is to ensure the efficient implementation of the project, such as project management, coordination, monitoring and evaluation (M&E), including: financial and procurement management, environmental and social assessments, preparation of project reports, and follow-up; studies, communication, internal and external audits, and operating costs and training for the PIU.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data