Benin Terminal
Sector: Water Supply and Storage • Location: Benin
Source: International Finance Corporation (IFC)
The proposed IFC investment consists of an A loan of up to EUR [20]mn out of a total debt package of EUR [75] mn to support Benin Terminal (“BT” or the “Company”), the concessionaire of the container terminal at the Port of Cotonou (“PAC” or the “Port”), in its EUR [165.5]mn investment plan to purchase new equipment and upgrade its terminal (the “Project”) following a concession agreement signed i
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Seaport, Warehouse, Government
- Location
- Benin
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Benin Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC investment consists of an A loan of up to EUR [20]mn out of a total debt package of EUR [75] mn to support Benin Terminal (“BT” or the “Company”), the concessionaire of the container terminal at the Port of Cotonou (“PAC” or the “Port”), in its EUR [165.5]mn investment plan to purchase new equipment and upgrade its terminal (the “Project”) following a concession agreement signed in July 2022 between the Company, the PAC and the Government of Benin (the “Concession Agreement”). BT is a subsidiary of African Global Logistic (“AGL” or “the Sponsor”), part of the MSC Group, a leading shipping and logistics group.The project is a brownfield upgrade of the existing container terminal / logistics zone from its current 32.6ha to 44.7 ha, with BT representing 23% of the total Port area (193 ha). Proceeds from the IFC investment will support (i) the purchase of equipment including ship to shore crane (STS), electric rubber gantry crane (RTGs), tractors and trailers, reachstakers, and empty handlers; (ii) the refinancing of the shareholder loan used by the Company to pay the entry ticket of the Concession Agreement to the Government of Benin; (iii) civil works & relocation of diesel power station; and (iv) IT. The Project is expected to be completed by the first semester of 2027. The Project is separate from a wider expansion program of the Port led by PAC, the state-owned entity (“SOE”) in charge of the management and development of the Port, of which the following works are considered Associated Facilities (AFs) to BT per IFC Performance Standards: (i) basin expansion works consisting of extension of the basin; (ii) dredging the basin and access channel; and (iii) extension of the quays. |
Original sector | E-BB - Port and Harbor Operations |
Location
Country | Benin |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Seaport, Warehouse, Government |
Article published date | 2026-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Benin
- Benin - Mono and Couffo Rural Development Support Project (PADMOC)
- Benin drinking water supply systems lease
- Benin - Community Forest Management Support Project - Phase II (PAGEFCOM-II)
- Benin - Energy Sector Budget Support Programme - Phase I (PASEBE I)
- SONEB-ALIMENTATION EN EAU URBAINE
- Container Terminal Cotonou Port
- HYDRAULIQUE URBAINE
- Benin - Djougou-Pehunco-Banikoara Cotton Road Development Project
