logo

Benthead Solar Farm and Battery Energy Storage System

Sector: Solar • Location: North Ayrshire, Scotland, United Kingdom

Source: reNews.Biz

Project
Planned

The Benthead Solar Farm is a new-build 84.5MW photovoltaic solar project co-located with a 31MW battery energy storage system (BESS) in north Ayrshire, Scotland. The project is expected to generate over 78.4GWh of electricity per year, enough to power more than 25,000 homes, and prevent around 17,000 tonnes of CO2 emissions annually. The site shares a 63MW grid connection between the solar farm an

Project Information FAQ

Project Information

3 Q
The project “Benthead Solar Farm and Battery Energy Storage System” is an infrastructure initiative in the Solar sector, located in North Ayrshire, Scotland, United Kingdom. Taiyo aggregates data on it from reNews.Biz.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Benthead Solar Farm is a new-build 84.5MW photovoltaic solar project co-located with a 31MW battery energy storage system (BESS) in north Ayrshire, Scotland. The project is expected to generate over 78.4GWh of electricity per year, enough to power more than 25,000 homes, and prevent around 17,000 tonnes of CO2 emissions annually. The site shares a 63MW grid connection between the solar farm and the AC-coupled battery asset, enabling strategic control of exports to maximize grid value. EDF has signed a long-term power purchase agreement (PPA) with Aukera to offtake 100% of the renewable energy generated from the project. Commissioning is targeted for 2026, with the PPA term expected to last nine to eleven years depending on the battery commissioning date. EDF will optimize the battery via its PowerShift platform using AI-driven real-time trading to maximize grid value and revenue. The project was awarded a 15-year Contract for Difference (CfD) as part of the UK Government's Allocation Round 6 to drive investment in renewable electricity generation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data