logo
ProjectBid Results

Beothuk Lake Dam - Electrical Recapitalization Nl

Sector: Hydro • Location: Ottawa, Ontario, Canada

Source: Dodge

The Work covered by this Contract will include the replacement of the existing fishway elevator electrical distribution shed at Beothuk Lake Dam, and all electrical equipment contained within the shed. Also included is the replacement of the fishway gate electric chain hoist and replacement of handrail baseplate bolts which are missing in the stairway leading from the top of the dam to fishway ent

Status
Closed
Sector
Hydro, Government, Power Generation (CCGT), Commercial, Manufacturing (Industrial), Water Supply and Storage
Location
Ottawa, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Beothuk Lake Dam - Electrical Recapitalization Nl

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Beothuk Lake Dam - Electrical Recapitalization Nl” is an infrastructure initiative in the Hydro sector, located in Ottawa, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work covered by this Contract will include the replacement of the existing fishway elevator electrical distribution shed at Beothuk Lake Dam, and all electrical equipment contained within the shed. Also included is the replacement of the fishway gate electric chain hoist and replacement of handrail baseplate bolts which are missing in the stairway leading from the top of the dam to fishway entrance on the downstream side of the dam. The Red Indian Lake Dam Fishway site is located approxim...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Ottawa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Hydro, Government, Power Generation (CCGT), Commercial, Manufacturing (Industrial), Water Supply and Storage

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project