Bergen Point WWTP Emergency Repair Scavenger Waste Facility
Sector: Water Supply and Storage • Location: West Babylon, New York, United States of America
Source: Dodge
Headworks: remove and replace influent screens, raise discharge point, add compactors, associated structural, electrical, HVAC work Influent pumps 1 & 2: are undersized need to be replaced, including magnetic drives Influent pump suction and discharge piping: for all six influent pumps including isolation valves need replacement, pipe supports Primary pipe gallery: concrete repair work to walls/fo
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Power Generation (CCGT), Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- West Babylon, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bergen Point WWTP Emergency Repair Scavenger Waste Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Headworks: remove and replace influent screens, raise discharge point, add compactors, associated structural, electrical, HVAC work Influent pumps 1 & 2: are undersized need to be replaced, including magnetic drives Influent pump suction and discharge piping: for all six influent pumps including isolation valves need replacement, pipe supports Primary pipe gallery: concrete repair work to walls/foundation/primary roof deck, HVAC for this gallery including electrical Hydroxide Chemical system:... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | West Babylon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Power Generation (CCGT), Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
