Berkeley Avenue Culvert Replacement
Sector: Water Supply and Storage • Location: Middletown, Rhode Island, United States of America
Source: Dodge
This project will replace the aging and undersized concrete culvert under Berkeley Avenue with a new reinforced concrete box culvert designed to accommodate higher flows of the Maidford River during storm events. In addition to the culvert replacement, the project includes raising the roadway approaches on both sides to prevent overtopping and flooding during heavy rainfall. The improvements are i
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Middletown, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Berkeley Avenue Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will replace the aging and undersized concrete culvert under Berkeley Avenue with a new reinforced concrete box culvert designed to accommodate higher flows of the Maidford River during storm events. In addition to the culvert replacement, the project includes raising the roadway approaches on both sides to prevent overtopping and flooding during heavy rainfall. The improvements are intended to enhance the hydraulic performance of the river crossing and increase the road s resili... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Middletown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
