Berkeley Vale Battery Energy Storage System
Sector: Energy Storage • Location: Berkeley Vale, New South Wales, Australia
Source: Central Coast Community News
A battery energy storage system (BESS) proposed by Ausgrid at Berkeley Vale with a capacity of 150 MW over a two-hour duration (300 MWh), located adjacent to Ausgrid’s existing 132 kV/11 kV Berkeley Vale Zone Substation at 14 Apprentice Dr, Berkeley Vale.
- Status
- Prospective
- Sector
- Energy Storage, Government
- Location
- Berkeley Vale, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- Central Coast Community News
ConstructChat
Ask ConstructChat about Berkeley Vale Battery Energy Storage System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A battery energy storage system (BESS) proposed by Ausgrid at Berkeley Vale with a capacity of 150 MW over a two-hour duration (300 MWh), located adjacent to Ausgrid’s existing 132 kV/11 kV Berkeley Vale Zone Substation at 14 Apprentice Dr, Berkeley Vale. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Berkeley Vale |
Source
Source | Central Coast Community News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Government |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
