Berkley Riverfront Mixed-use Development Buildings 50% CDs
Sector: Steel • Location: Kansas City, Missouri, United States of America
Source: Dodge USA
Plans for a 7 story apartment building with parking garage and mixed use on levels 1 and 2 on parcel 7. Exterior materials include, EWS-01 FIXED AND OPERABLE GLAZED WINDOW SYSTEM (WITH OPERABLE JULIET BALCONIES WHERE RAILING IS SHOWN AND SWING DOORS AT BALCONIES), EWS-02 FIXED AND OPERABLE GLAZED STOREFRONT SYSTEM, EWS-10A BRICK VENEER (ON COLD-FORMED METAL FRAMING), EWS-10B ARTICULATED BRICK VENE
- Status
- Closed
- Sector
- Steel, Metal, Manufacturing (Industrial), Residential, Rail, Commercial, Car parking, Automotive
- Location
- Kansas City, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Berkley Riverfront Mixed-use Development Buildings 50% CDs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Plans for a 7 story apartment building with parking garage and mixed use on levels 1 and 2 on parcel 7. Exterior materials include, EWS-01 FIXED AND OPERABLE GLAZED WINDOW SYSTEM (WITH OPERABLE JULIET BALCONIES WHERE RAILING IS SHOWN AND SWING DOORS AT BALCONIES), EWS-02 FIXED AND OPERABLE GLAZED STOREFRONT SYSTEM, EWS-10A BRICK VENEER (ON COLD-FORMED METAL FRAMING), EWS-10B ARTICULATED BRICK VENEER (ON COLD-FORMED METAL FRAMING), EWS-11A BRICK VENEER (ON WOOD FRAMING), EWS-11B ARTICULATED BR... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Kansas City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Manufacturing (Industrial), Residential, Rail, Commercial, Car parking, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
