Berkshire Valley Road (C.R. 642) Drainage Improvements
Sector: Water Supply and Storage • Location: Ledgewood, New Jersey, United States of America
Source: Dodge USA
1 LS-Mobilization; 1 LS-Clearing Site; 20 CY-Excavation, Test Pits; 100 S.Y.-Dense Graded Aggregate Base Course, 4" Thick (Driveway Restoration); 750 SY- HMA Milling, 2" Thick; 120 TON- Hot Mix Asphalt 9.5M64 Surface Course, 2" Thick; 70 TON-Hot Mix Asphalt 19M64 Base Course, 7" Thick (In Two Lifts); 185 LF-15" DIA. Perforated HDPE Pipe W/ Stone Bedding; 32 LF-15" DIA. RCP W/Stone Bedding, Class V
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- Ledgewood, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Berkshire Valley Road (C.R. 642) Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1 LS-Mobilization; 1 LS-Clearing Site; 20 CY-Excavation, Test Pits; 100 S.Y.-Dense Graded Aggregate Base Course, 4" Thick (Driveway Restoration); 750 SY- HMA Milling, 2" Thick; 120 TON- Hot Mix Asphalt 9.5M64 Surface Course, 2" Thick; 70 TON-Hot Mix Asphalt 19M64 Base Course, 7" Thick (In Two Lifts); 185 LF-15" DIA. Perforated HDPE Pipe W/ Stone Bedding; 32 LF-15" DIA. RCP W/Stone Bedding, Class V; 1 UNIT-Seepage Pit, 1000 Gallon; 2 UNITS- Inlet, Type E; 1 UNIT- Manhole, 4' Diameter |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Ledgewood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
