Bermuda Offshore Wind Farm
The owner, status and timeline of this project. A free account opens every field.
Source: The Cool Down
The government of Bermuda plans to construct an offshore wind farm to harness the island's windy weather, starting with 17 turbines by 2027. The initial installation will have a 60-megawatt capacity near the north of Bermuda, with plans to scale up to 120 megawatts. The project aims to increase power supply, stabilize the electrical grid, lower energy prices, and reduce dependence on imported fuel
- Status
- Prospective
- Sector
- Wind, Government, Raw Materials, Power Generation (CCGT)
- Location
- Bermuda
- Updated
- 22 Jul 2026
- Source
- The Cool Down
ConstructChat
Ask ConstructChat about Bermuda Offshore Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The government of Bermuda plans to construct an offshore wind farm to harness the island's windy weather, starting with 17 turbines by 2027. The initial installation will have a 60-megawatt capacity near the north of Bermuda, with plans to scale up to 120 megawatts. The project aims to increase power supply, stabilize the electrical grid, lower energy prices, and reduce dependence on imported fuels, supporting Bermuda's goal of 85% renewable energy by 2035. |
Original sector | Energy |
Location
Country | Bermuda |
Source
Source | The Cool Down |
URL |
More Details
Record type | Project |
Sector | Wind, Government, Raw Materials, Power Generation (CCGT) |
Article published date | 2025-06-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
