Berna Culvert Improvements
Pre-design · Ohio · Last reported Feb 2024
Source: Dodge USA
Storm water improvement: The existing 2-24 culverts will be removed and replaced with a 6 x 4 concrete box culvert with full height headwalls and wing walls so runoff can be conveyed into the culvert.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
- Location
- Green, Ohio, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Berna Culvert Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Storm water improvement: The existing 2-24 culverts will be removed and replaced with a 6 x 4 concrete box culvert with full height headwalls and wing walls so runoff can be conveyed into the culvert. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Green |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
