Bernina Railway Line
Sector: Mass Transit • Location: Chur to Tirano, Switzerland and Italy
Source: Quartz
The Bernina railway line is part of the Rhaetian Railway in Switzerland and Italy, crossing the Bernina Pass at 2,253 meters above sea level. It is the highest railway crossing of the Alps operated year-round without cog wheels or racks. It is a UNESCO World Heritage Site and offers panoramic train services.
- Status
- Under Construction
- Sector
- Mass Transit, Rail
- Location
- Chur to Tirano, Switzerland and Italy
- Updated
- 22 Jul 2026
- Source
- Quartz
ConstructChat
Ask ConstructChat about Bernina Railway Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bernina railway line is part of the Rhaetian Railway in Switzerland and Italy, crossing the Bernina Pass at 2,253 meters above sea level. It is the highest railway crossing of the Alps operated year-round without cog wheels or racks. It is a UNESCO World Heritage Site and offers panoramic train services. |
Original sector | Built Environment |
Location
Country | Switzerland and Italy |
City | Chur to Tirano |
Source
Source | Quartz |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail |
Article published date | 2026-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
