logo

Berry Hill Data Center Campus

Sector: Power Generation (CCGT) • Location: Danville, Virginia, United States

Source: Virginia Business

Project
Planned

A proposed $100 billion data center campus by Stack Infrastructure at the Southern Virginia Megasite at Berry Hill in Pittsylvania County. The project is planned to be developed in phases over three decades, creating approximately 2,500 jobs and thousands of construction positions. The first phase includes at least 1,000 acres, with a minimum annual tax payment of $16.25 million for that acreage.

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage, Data Center, Manufacturing (Industrial)
Location
Danville, Virginia, United States of America
Updated
22 Jul 2026
Source
Virginia Business

ConstructChat

Ask ConstructChat about Berry Hill Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Berry Hill Data Center Campus” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Danville, Virginia, United States. Taiyo aggregates data on it from Virginia Business.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed $100 billion data center campus by Stack Infrastructure at the Southern Virginia Megasite at Berry Hill in Pittsylvania County. The project is planned to be developed in phases over three decades, creating approximately 2,500 jobs and thousands of construction positions. The first phase includes at least 1,000 acres, with a minimum annual tax payment of $16.25 million for that acreage. The project will be powered by Appalachian Power and use water from the Dan River.

Original sector

Technology

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Danville

Source

Source

Virginia Business

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Data Center, Manufacturing (Industrial)

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project