Berths 238-239 Marine Oil Terminal Improvements REBID
Bidding · California · Last reported Dec 2024
Source: Dodge USA
BERTHS 238-239 MARINE OIL TERMINAL IMPROVEMENTS -- The Project consists of demolition and removal of the existing concrete loading/unloading platforms, catwalks, access ramps, mooring and berthing dolphins at Berths 238 and 239 and the construction of a new loading/unloading platform, access ramp, 2 berthing dolphins, 4 landside mooring dolphins, catwalks, installation of a new fender system at Be
- Status
- Prospective
- Sector
- Government, Cement, Commercial, Oil and Gas
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Berths 238-239 Marine Oil Terminal Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BERTHS 238-239 MARINE OIL TERMINAL IMPROVEMENTS -- The Project consists of demolition and removal of the existing concrete loading/unloading platforms, catwalks, access ramps, mooring and berthing dolphins at Berths 238 and 239 and the construction of a new loading/unloading platform, access ramp, 2 berthing dolphins, 4 landside mooring dolphins, catwalks, installation of a new fender system at Berth 238 and improvements |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Oil and Gas |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
