Berths 302-305 On Dock Rail Expansion
Sector: Water Supply and Storage • Location: San Pedro, California, United States of America
Source: Dodge USA
Project consists of installing 5 new rail tracks (approximately 12,000 linear feet); grading and paving; drainage; fencing; steel casing; sewer; waterline relocation; fire protection; electrical improvements; and striping and signage. The track consists of 136 pound continuously welded rail (CWR) on concrete ties, timber ties, ballast, and subballast. The on-dock railyard expansion also includes p
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Steel, Government, Forest Products and Packaging, Mass Transit, Rail, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Metal
- Location
- San Pedro, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Berths 302-305 On Dock Rail Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of installing 5 new rail tracks (approximately 12,000 linear feet); grading and paving; drainage; fencing; steel casing; sewer; waterline relocation; fire protection; electrical improvements; and striping and signage. The track consists of 136 pound continuously welded rail (CWR) on concrete ties, timber ties, ballast, and subballast. The on-dock railyard expansion also includes powered turnouts, manual derails, track bumpers, and expansion of the existing train-in-motion sys... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Pedro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Government, Forest Products and Packaging, Mass Transit, Rail, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
