BESS Implementation at Mouda Super Thermal Power Station
Sector: Manufacturing (Industrial) • Location: Mouda, India
Source: ET Manufacturing
GR Infraprojects Limited has executed an engineering, procurement and construction (EPC) agreement with NTPC Limited for a battery energy storage system (BESS) project at the Mouda Super Thermal Power Station. The project will be executed under the EPC mode and has a completion period of 15 months from the appointed date.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Energy Storage, Geothermal
- Location
- Mouda, India
- Updated
- 22 Jul 2026
- Source
- ET Manufacturing
ConstructChat
Ask ConstructChat about BESS Implementation at Mouda Super Thermal Power Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GR Infraprojects Limited has executed an engineering, procurement and construction (EPC) agreement with NTPC Limited for a battery energy storage system (BESS) project at the Mouda Super Thermal Power Station. The project will be executed under the EPC mode and has a completion period of 15 months from the appointed date. |
Original sector | Energy |
Budget |
Location
Country | India |
City | Mouda |
Source
Source | ET Manufacturing |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Energy Storage, Geothermal |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
