logo
ProjectPlanned

BESS Villa María

The owner, status and timeline of this project. A free account opens every field.

Source: Strategic Energy Europe

Battery energy storage system project with 30 MW power capacity and 150 MWh storage, connected at 13.2 kV, located in General San Martín, Córdoba province, Argentina. Part of a provincial call by EPEC to position assets in the national AlmaSADI tender.

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT)
Location
General San Martín, Córdoba, Argentina
Updated
19 Nov 2026
Source
Strategic Energy Europe

ConstructChat

Ask ConstructChat about BESS Villa María

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BESS Villa María” is an infrastructure initiative in the Energy Storage sector, located in General San Martín, Córdoba, Argentina. Taiyo aggregates data on it from Strategic Energy Europe.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Battery energy storage system project with 30 MW power capacity and 150 MWh storage, connected at 13.2 kV, located in General San Martín, Córdoba province, Argentina. Part of a provincial call by EPEC to position assets in the national AlmaSADI tender.

Original sector

Energy

Budget

Location

Country

Argentina

State

Córdoba

City

General San Martín

Source

Source

Strategic Energy Europe

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT)

Article published date

2026-04-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project