BESS Villa María
The owner, status and timeline of this project. A free account opens every field.
Source: Strategic Energy Europe
Battery energy storage system project with 30 MW power capacity and 150 MWh storage, connected at 13.2 kV, located in General San Martín, Córdoba province, Argentina. Part of a provincial call by EPEC to position assets in the national AlmaSADI tender.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- General San Martín, Córdoba, Argentina
- Updated
- 19 Nov 2026
- Source
- Strategic Energy Europe
ConstructChat
Ask ConstructChat about BESS Villa María
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Battery energy storage system project with 30 MW power capacity and 150 MWh storage, connected at 13.2 kV, located in General San Martín, Córdoba province, Argentina. Part of a provincial call by EPEC to position assets in the national AlmaSADI tender. |
Original sector | Energy |
Budget |
Location
Country | Argentina |
State | Córdoba |
City | General San Martín |
Source
Source | Strategic Energy Europe |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2026-04-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
