Betances Learning Lab Magnet School Phase II
Sector: Commercial • Location: Hartford, Connecticut, United States of America
Source: Dodge USA
Projected to serve 440 students in grades Pre-Kindergarten through 4th grade, the project will take place at the existing 75,980 square foot school located at 42 Charter Oak Avenue in Hartford. The existing school will be renovated as new, per the Connecticut General Statutes, in its entirety to address long term facility issues. The auditorium will be retained and renovated with new seating, soun
- Status
- Closed
- Sector
- Commercial, Education, Government
- Location
- Hartford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Betances Learning Lab Magnet School Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Projected to serve 440 students in grades Pre-Kindergarten through 4th grade, the project will take place at the existing 75,980 square foot school located at 42 Charter Oak Avenue in Hartford. The existing school will be renovated as new, per the Connecticut General Statutes, in its entirety to address long term facility issues. The auditorium will be retained and renovated with new seating, sound and lighting systems, and storage spaces. The existing gymnasium and cafeteria will be retained... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Hartford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Government |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
