Bethlehem Hydro

Sector: Hydro • Location: South Africa

Source: World Bank Group

Project
Active

In May 2005 Bethlehem Hydro signed agreements with Dihlabeng local municipality to build a 4MW hydroelectric plant in the Free State. The project consisted of a 1.7MW site at the Saulkspoort Dam on the As River, and a 2.2MW run of river site. The project was the first hydro plant in South Africa, and also the first Independent Power Plant in South Africa. The plant would provide power to the Be

Project Information FAQ

Project Information

4 Q
The project “Bethlehem Hydro” is an infrastructure initiative in the Hydro sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2005 Bethlehem Hydro signed agreements with Dihlabeng local municipality to build a 4MW hydroelectric plant in the Free State. The project consisted of a 1.7MW site at the Saulkspoort Dam on the As River, and a 2.2MW run of river site. The project was the first hydro plant in South Africa, and also the first Independent Power Plant in South Africa. The plant would provide power to the Bethlehem community by selling electricity to Dithlabeng local council in eastern Free State, and also expected to sell greenhouse gas emissions credits. The plant was the first IPP project in South Africa. Bethlehem Hydro was a joint venture between Dutch firm NuPlanet BV (26%), the Energy Development Corporation of South Africa (49%) and Black Economic Empowerment (25%). The total project cost was R42 million (US$ 6.66 million). Of this, the Development Bank of South Africa provided US$ 4.75 million through a 15 year term loan. The remainder was equity provided by NuPlanet (US$ 0.6 million) and EDC (US$1.2 million). Construction of the plant began in late 2005, and it was due to become operational by 2007.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data