BETHUNE ELEMENTARY SCHOOL - SRTS
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project consists of providing new sidewalk on both sides of Old Carriage Lane, along Carriage Lane from Ocean Valley Rd. to Guilford Lane, and both sides of Ocean Valley Rd. from the Bethune Elementary School’s south entrance to Carriage Lane. Additionally, intermittent sidewalk connectivity will be provided along the left side of Carriage Lane from Middleburg Dr. to Ocean Valley Rd. Crosswa
- Status
- Closed
- Sector
- Road, Car parking, Automotive, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about BETHUNE ELEMENTARY SCHOOL - SRTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of providing new sidewalk on both sides of Old Carriage Lane, along Carriage Lane from Ocean Valley Rd. to Guilford Lane, and both sides of Ocean Valley Rd. from the Bethune Elementary School’s south entrance to Carriage Lane. Additionally, intermittent sidewalk connectivity will be provided along the left side of Carriage Lane from Middleburg Dr. to Ocean Valley Rd. Crosswalks, striping, and ADA Ramps improvements will be provided throughout the project limits. All required signs, striping and lighting will also be provided/installed for the “school zone” area(s) since none currently exist. The net length of the project is approximately 0.45 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
