logo

Betul Wind Farms Limited

Sector: Solar • Location: India

Source: World Bank Group

Project
Active

In May 2009, United Telecoms Limited (UTL),signed an MoU with Madhya Pradesh Government for setting up a 49.5-MW wind project at Kukru village, Betul District in the state of Madhya Pradesh, under the MP Solar Policy 2010. The output from the project would be fed to the North-East-West-North-East (NEWNE) grid of India. The project has deployed 33 Regen wind electric generators of 1500kW each. Powe

Project Information FAQ

Project Information

4 Q
The project “Betul Wind Farms Limited” is an infrastructure initiative in the Solar sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2009, United Telecoms Limited (UTL),signed an MoU with Madhya Pradesh Government for setting up a 49.5-MW wind project at Kukru village, Betul District in the state of Madhya Pradesh, under the MP Solar Policy 2010. The output from the project would be fed to the North-East-West-North-East (NEWNE) grid of India. The project has deployed 33 Regen wind electric generators of 1500kW each. Power evacuation was planned through a 66KV line to substation, which, as per the state policy, was the responsibility of M.P.Power Management Company Limited. ReGen Powertech would execute the EPC and O&M of the project. United Telecoms Limited (100%) established Betul Wind Farms Limited (BWFL), special purpose vehicle, to execute the project. In March 2014, Atria Group acquired 50% of equity stake from UTL. BWFL had signed a PPA with the state utility MP Power Management Company Limited (MPPCL) on 22.07.2011 for sale of power generated by 30 MW (20 X 1500 kW) WEGs. BWFL had signed second PPA with BPPCL on 8.11.2012 for sale of entire energy generated by additional 19.5 MW (13 X 1500 kW) WEGs (over and above 30 MW). On 26.03.2013, the Commission had issued revised tariff order which was applicable to all new WEGs power projects commissioned on or after 01.04.2013 during the control period 01.04.2013 to 31.03.2016 for sale of electricity to distribution licensees within the state of Madhya Pradesh. The tariff at US$ 0.097/Unit (INR 5.92 per unit @61 INR/USD) would remain valid for the project life of 25 years. The project attained financial closure on 19th March 2014 with a debt equity ratio 70/30. The estimated project cost at the time of financial closure was US$ 56.4mn (INR 3441.1mn @61 INR/USD). Financing comprised of Debt of US$ 39.5mn (INR 2408.8mn) and sponsor equity of US$ 16.9mn (INR 1032.3mn). Lenders were State Bank of India (1000mn, India Infrastructure Finance Company Limited (600mn), and PTC India Financial Services (808.8mn). The plant was expected to be commissioned in December 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data