Beulah Road Utility Relocation
Sector: Water Supply and Storage • Location: Florida, United States of America
Source: Dodge
Installation of approximately 880 linear feet of 20-inch HDPE force main along the west side of Beulah Road at Beulah Church Road. The project also includes a relocation of 6-inch water main and fire hydrant relocations. The project is planned to coincide with planned FDOT resurfacing and drainage improvements along Beulah Road.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Installation of approximately 880 linear feet of 20-inch HDPE force main along the west side of Beulah Road at Beulah Church Road. The project also includes a relocation of 6-inch water main and fire hydrant relocations. The project is planned to coincide with planned FDOT resurfacing and drainage improvements along Beulah Road. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
