Beulah Road Utility Relocation
Sector: Water Supply and Storage • Location: Florida, United States of America
Source: Dodge
Installation of approximately 880 linear feet of 20-inch HDPE force main along the west side of Beulah Road at Beulah Church Road. The project also includes a relocation of 6-inch water main and fire hydrant relocations. The project is planned to coincide with planned FDOT resurfacing and drainage improvements along Beulah Road.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment
- Location
- Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Beulah Road Utility Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of approximately 880 linear feet of 20-inch HDPE force main along the west side of Beulah Road at Beulah Church Road. The project also includes a relocation of 6-inch water main and fire hydrant relocations. The project is planned to coincide with planned FDOT resurfacing and drainage improvements along Beulah Road. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
