Bexar County ESD#2 Fire Station 125
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
The Project s Base Bid consists of the construction of a new Fire Station 125 and all associated site and utility work. The new Fire Station will be located on a 2 acre lot. The new Fire Station will be approximately 19,475 sq ft, including living quarters, training room, conference room, sleeping quarters, offices, four pull through apparatus bays, and support spaces. It will be a wood stud const
- Status
- Closed
- Sector
- Metal, Cement, Rail, Power Transmission, Steel, Government, Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bexar County ESD 2 Fire Station 125
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project s Base Bid consists of the construction of a new Fire Station 125 and all associated site and utility work. The new Fire Station will be located on a 2 acre lot. The new Fire Station will be approximately 19,475 sq ft, including living quarters, training room, conference room, sleeping quarters, offices, four pull through apparatus bays, and support spaces. It will be a wood stud construction building with steel framing in the apparatus bay, and a stone masonry and fiber cement pl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Rail, Power Transmission, Steel, Government, Residential, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
