BF-Ouaga Water Suply (FY01)
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Ouagadougou Water Supply Project will increase access to adequate, and reliable potable water in the city, through expansion of the distribution, and tertiary water networks, and, through improvements in the urban water sub-sector management. Project components include: 1) construction of the Boudtenga storage facility, and ductile cast iron transmission main, which further includes the constr
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Steel, Metal, Residential, Government, Commercial
- Location
- Burkina Faso
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BF-Ouaga Water Suply (FY01)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ouagadougou Water Supply Project will increase access to adequate, and reliable potable water in the city, through expansion of the distribution, and tertiary water networks, and, through improvements in the urban water sub-sector management. Project components include: 1) construction of the Boudtenga storage facility, and ductile cast iron transmission main, which further includes the construction of distribution, and tertiary networks, and, the installation of connections, and stand-posts; 2) technical assistance (TA) provision, through the supervision of infrastructure project works; and, review, and approval of construction drawings, equipment supply, quality of materials, and works implementation progress; and, 3) capacity building, and institutional strengthening, through a capacity building program, and TA to support the National Office for Water and Sanitation's corporate, and technical development, as well as developing, and implementing management training programs in personnel, and financial/administrative management, including training programs for technical operators regarding water systems, and maintenance works. Moreover, commercial operations, and financial management will be improved, standardizing operating manuals, establishing a computerized financial management system, and databases for better customer services, and, operating investment resources will be available. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Burkina Faso |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Steel, Metal, Residential, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
