BF800 HVDC Project
One of 14 projects Taiyo tracks in Rajasthan and Uttar Pradesh.
Source: Saur Energy International
BHEL has received a Letter of Intent for the BF800 HVDC Project, which involves designing and executing a High Voltage Direct Current link to transmit renewable energy from Bhadla in Rajasthan and Fatehpur in Uttar Pradesh. The project is planned for completion by 2030 and includes the construction of two HVDC LCC terminal stations with a capacity of 6000 MW.
- Status
- Prospective
- Sector
- Solar, Power Transmission, Power Generation (CCGT)
- Location
- Bhadla and Fatehpur, Rajasthan and Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy International
ConstructChat
Ask ConstructChat about BF800 HVDC Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BHEL has received a Letter of Intent for the BF800 HVDC Project, which involves designing and executing a High Voltage Direct Current link to transmit renewable energy from Bhadla in Rajasthan and Fatehpur in Uttar Pradesh. The project is planned for completion by 2030 and includes the construction of two HVDC LCC terminal stations with a capacity of 6000 MW. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Rajasthan and Uttar Pradesh |
City | Bhadla and Fatehpur |
Source
Source | Saur Energy International |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
