BGIS - CANMET Wind Turbine Feasibility Study
Sector: Power Generation (CCGT) • Location: Nepean, Ontario, Canada
Source: Dodge
A study is required to evaluate the feasibility of the installation of a 30-metre vertical-axis wind turbine at the Bell s Corners Complex. Note that study is intended to be non-intrusive and will focus on code review, environmental impacts, feasibility, etc. as per the attached requirements document. Please review all attached documentation for full scope details.
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Wind
- Location
- Nepean, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about BGIS - CANMET Wind Turbine Feasibility Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A study is required to evaluate the feasibility of the installation of a 30-metre vertical-axis wind turbine at the Bell s Corners Complex. Note that study is intended to be non-intrusive and will focus on code review, environmental impacts, feasibility, etc. as per the attached requirements document. Please review all attached documentation for full scope details. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Nepean |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Wind |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
