Bhadla Solar Project Final Tranche Commercial Operation
Sector: Solar • Location: Phalodi, Rajasthan, India
Source: Mercomindia.com
NTPC Renewable Energy announced commercial operation of the third and final tranche of 75 MW out of the total 500 MW Bhadla solar project located in Phalodi, Rajasthan, effective March 25, 2026.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Commercial
- Location
- Phalodi, Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Bhadla Solar Project Final Tranche Commercial Operation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NTPC Renewable Energy announced commercial operation of the third and final tranche of 75 MW out of the total 500 MW Bhadla solar project located in Phalodi, Rajasthan, effective March 25, 2026. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
City | Phalodi |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Commercial |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
