BHEL HVDC Project
Awarded · Last reported Feb 2025
Source: The Economic Times
BHEL received a letter of intent (LoI) from Rajasthan Part I power transmission for the BF800 HVDC project, along with a thermal power station project worth Rs 8,000 crore from Maharashtra State Power Generation.
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT)
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about BHEL HVDC Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BHEL received a letter of intent (LoI) from Rajasthan Part I power transmission for the BF800 HVDC project, along with a thermal power station project worth Rs 8,000 crore from Maharashtra State Power Generation. |
Budget |
Location
| Not available for this record. |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT) |
Article published date | 2025-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
