BHEL Renewable Energy Project
The owner, status and timeline of this project. A free account opens every field.
Source: Times of India
Bharat Heavy Electricals Ltd (BHEL) has received a letter of intent to design and execute a high-voltage direct current (HVDC) link along with associated AC substations to transmit renewable energy from Bhadla III in Rajasthan and Fatehpur in UP. The project will establish two HVDC LCC terminal stations of 6,000 MW at Bhadla and Fatehpur, and is expected to be completed by 2030.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Bhadla, Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about BHEL Renewable Energy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bharat Heavy Electricals Ltd (BHEL) has received a letter of intent to design and execute a high-voltage direct current (HVDC) link along with associated AC substations to transmit renewable energy from Bhadla III in Rajasthan and Fatehpur in UP. The project will establish two HVDC LCC terminal stations of 6,000 MW at Bhadla and Fatehpur, and is expected to be completed by 2030. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
City | Bhadla |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
